Westinghouse Power Generation Business Unit (PGBU) Combustion Turbine Division (CT) had developed an Advanced Combustion Turbine. O’Donnell Consulting was asked to perform stress and vibration analysis for the project.
The work consisted of:
• Stress analysis for the following loadings
• Steady-State Operating Pressure
• Steady-State Operating Temperatures
• Harmonic Pressure Pulse
• Natural Frequencies Analysis
Â
 For over 30 years, our team of Engineers has been performing design, analysis and troubleshooting services.
Related Projects
– Failure Analysis of Studs on an Electric Turbine Outer Head Cover
– Failure Analysis on 3rd Stage Blade of a Gas Turbine
Similar Services
– Finite Element Analysis
– Engineering Design & Analysis
– Power Plant Consulting