Fracking Pump Failure Analysis Fracking Pump - FEA of Transmission Keyway

 
We were asked to perform a failure analysis on a pump used in fracking operations. The pump is driven through a transmission by a 2700 HP engine which varies in RPM. The transmission is connected to the pump by a universal joint to a flange and shaft assembly.

The assembly was made up of a flanged input hub, key, and pump input shaft. The flanged hub and input shaft had an interference fit reducing the overall load on the key. The original design incorporated a 4 inch diameter shaft, which, during testing, had failed. We not only determined the fatigue life of the 4 inch shaft, but also designed a 5 inch shaft to increase the expected design life of the new pumps.
 

Related Projects
Failure Analysis & Redesign of an Oil/Gas Threaded Joint Casing
Failure Analysis of a Seized Piston on a Monel Series 3800 Pressure Relief Valve

 
Similar Services
Failure Analysis Services
Power Plant Consulting

Share

Business Email Address*We only accept business email addresses.

Message